Annual due in December.
It has been 641 hours since the last major overhaul. (As of 10/6/22 – times subject to change as plane still being flown.) Addressing every loose screw, every chafing wire, every leak and drip, your first annual will be limited to adding air the the tires.
All Airworthiness Directives are current and complied with. Even the fuel tanks were recently pulled, new fuel level senders installed and old wiring replaced.
The original logs are complete and include detailed AD lists, 337 forms.
The original serialized flight manual and supplements is also included.